Piling Load Testing Projects

  • 7800 TPD Grey Cement Production Line-4

  • Orient Hotel Tower, Lahore

  • 8000 TPD Pioneer Cement Line-III

  • 18MWp Harappa Solar Power Plant –Sahiwal(SUMEC China)

  • 1230MW CC Haveli Bahadur Shah Power Plant-Jhang 

  • Lahore Ring Road Southern Loop Project 

  • Sahiwal 2x660MW Coal Fired Power Plant-TEPC China

  • Sahiwal 2x660MW Coal Fired Power Plant-SEPCO1 China

  • Orange Line Metro Train Project

  • Sahiwal 2x660MW Coal Fired Power Plant-SDEPCl China

  • 15MW Waste Heat Recovery Power Plant-Kohat KPK

  • 2x50MWFWEL-I&II Wind Power Project-Gharo Sindh

  • 400MW CCP UCH-II Power Plant Dera Murad Jamali - Province Balouchistan

  • 225 MW CCP Power Plant Project Bhikki, Sheikhupura

  • The Centaurus Project-Islamabad (seven star hotel/apartments)

  • 7200 TPD Fauji Cement Plant Expansion Project, Jhag Bahtar

2018

2018

2017

2017

2017

2016

2016

2015

2015

2014

2014

2013

2011

 2009

2008

2008